81 Upper Canada Dr, Toronto
Zoning RD
Residential Detached with a site-specific exception.
Height limit: 10 m, 2 storeys
Lot coverage: 35%
An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013
Homes allowed
- ✅ Up to 4 homes in a house-form building
- ✅ Plus a garden suite, or a laneway suite if the lot is on a public lane
- — Sixplexes aren’t allowed as of right in ward 15 yet (only in 9 wards); a variance would be needed
Ward 15, Don Valley West. Development charges are waived for multiplexes of up to 6 homes in Toronto.
Limits None mapped
- Heritage: not on the register
- Flood and conservation: none mapped
Rulings within 400 m
No Committee of Adjustment rulings on 3+ unit projects nearby since 2017.
Building permits here
- New Building · 2021 · ClosedProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 21 172772 DEM.
- Demolition · 2021 · ClosedProposal for interior alterations to demolish the existing 1 storey SFD-detached dwelling.
- Other · 2018 · ClosedRevision 01 - Increase in garage wall replacement as per drawings.Proposal for interior alterations, exterior wall and roof repair due to fi
Development applications within 500 m
- 6 OAKBURN CRESSite Plan · Under Review
For sale here now
- 81 Upper Canada Drive$6,500,000
Run the numbers for this lot See it on the planning map
A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.
Talk to us about a property
Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.