Lot check

1940 Eglinton Ave E, Toronto

Zoning CR

Commercial Residential with a site-specific exception.

Height limit: 11 m

Lot coverage: 33%

An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013

Homes allowed

Apartment or mixed-use zone: more homes possible.

Ward 21, Scarborough Centre. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits Check

  • Heritage: Listed
  • Flood and conservation: none mapped

Rulings within 400 m

No Committee of Adjustment rulings on 3+ unit projects nearby since 2017.

All rulings

Building permits here

  • Electromagnetic Locks · 2024 · Inspection
    Instalation of maglocks - 3rd floor
  • Interior Alterations · 2024 · Closed
    Proposal to construct interior alterations to existing office space
  • Electromagnetic Locks · 2024 · Closed
    Proposed installation of one (1) single electromagnetic locking device on 2nd floor
  • Interior Alterations · 2024 · Closed
    Interior alterations on 4th floor for existing office
  • Interior Alterations · 2023 · Inspection
    Proposed Interior Alterations of the second storey of an existing four storey building. from an office space to a proposed medical office sp
  • Interior Alterations · 2023 · Inspection
    Interior alterations to renovate existing RBC Bank - Unit 100, to create two client meeting rooms within the existing footprint. There is no

Development applications within 500 m

  • 1891 EGLINTON AVE E
    Site Plan · Under Review
  • 1891 EGLINTON AVE E
    Site Plan · Under Review
  • 1891 EGLINTON AVE E
    Site Plan · Under Review
  • 1891 EGLINTON AVE E
    Site Plan · Under Review
  • 1900 EGLINTON AVE E
    Official Plan / Zoning By-law Amendment · Under Review
  • 1900 EGLINTON AVE E
    Plan of Subdivision · Under Review

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.