209 Atlas Ave, Toronto
Zoning RM
Residential Multiple Dwelling with a site-specific exception.
Height limit: 11 m, 3 storeys
An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013
Homes allowed
- ✅ Up to 6 homes in a house-form building (sixplex ward)
- ✅ Plus a garden suite, or a laneway suite if the lot is on a public lane
Ward 12, Toronto-St. Paul's. Development charges are waived for multiplexes of up to 6 homes in Toronto.
Limits None mapped
- Heritage: not on the register
- Flood and conservation: none mapped
Rulings within 400 m
- 350 Vaughan Rd · 293 mApproved · 6 units · Apartment building · May 27, 2026
- 178 Atlas Ave · 153 mApproved · 3 units incl. a suite · New building · Apr 30, 2025
- 438 Arlington Ave · 293 mApproved · 3 units incl. a suite · Multiplex · Apr 9, 2025
- 423 Vaughan Rd · 150 mApproved · 3 units · Nov 3, 2021
- 201 Cedric Ave · 398 mApproved · 4 units · Conversion of a house · May 12, 2021
Building permits here
- Garage · 2017 · ClosedConstruction of a new detached garage (21.05m2) in rear yard of single family detached dwelling.
- Interior Alterations · 2016 · ClosedProposal for interior alterations to existing detached single family dwelling.
Development applications within 500 m
- 443 ARLINGTON AVESite Plan · Under Review
- 501 ARLINGTON AVESite Plan · NOAC Issued
For sale here now
- 209 Atlas Avenue$1,689,000
Run the numbers for this lot See it on the planning map
A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.
Talk to us about a property
Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.