Lot check

174 Cedric Ave, Toronto

Zoning RM

Residential Multiple Dwelling with a site-specific exception.

Height limit: 11 m, 3 storeys

An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013

Homes allowed

  • ✅ Up to 6 homes in a house-form building (sixplex ward)
  • ✅ Plus a garden suite, or a laneway suite if the lot is on a public lane

Ward 12, Toronto-St. Paul's. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits None mapped

  • Heritage: not on the register
  • Flood and conservation: none mapped

Applications at this address

Rulings within 400 m

  • Approved · 3 units incl. a suite · Conversion of a house · Sep 9, 2026
  • Approved · 4 units incl. a suite · Aug 13, 2025
  • Refused · 5 units incl. a suite · New building · Mar 27, 2024
  • Approved · 5 units · Apartment building · Sep 21, 2022
  • Approved · 3 units · Multiplex · Aug 17, 2022
  • Approved · 4 units · Multiplex · Dec 8, 2021
  • Approved · 4 units · Conversion of a house · May 12, 2021

All rulings

Building permits here

  • Multiple Projects · 2021 · Closed
    To construct two storey front addition, and third storey middle addition to existing dwelling, front porch, rear deck and interior alteratio

Development applications within 500 m

  • 443 ARLINGTON AVE
    Site Plan · Under Review
  • 464 OAKWOOD AVE
    Plan of Condominium · Draft Plan Approved

For sale here now

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.