Lot check

81 St. Clair Ave E, Toronto

Zoning CR

Commercial Residential with a site-specific exception.

Height limit: 46 m

An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013

Homes allowed

Apartment or mixed-use zone: more homes possible.

Ward 12, Toronto-St. Paul's. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits None mapped

  • Heritage: not on the register
  • Flood and conservation: none mapped

Rulings within 400 m

All rulings

Building permits here

  • Interior Alterations · 2023 · Closed
    proposing inteior alteratoin for take out only restaurant - GONG CHA-TAKEOUT
  • Interior Alterations · 2023 · Closed
    Interior fit up for a retail store in Unit 114 - Wine Rack
  • Interior Alterations · 2022 · Closed
    Interior alterations - Ground floor - Farm boy Grocery Store
  • Interior Alterations · 2021 · Closed
    Interior alternations required to return an existing 2,218sm Sobeys Urban Fresh grocery store at theground floor tenant suite back to base b

Development applications within 500 m

  • 1560 YONGE ST
    Site Plan · Application Received
  • 22 ST CLAIR AVE E
    Site Plan · Under Review
  • 1502 YONGE ST
    Plan of Condominium · Draft Plan Approved
  • 100 INGLEWOOD DR
    Plan of Condominium · Draft Plan Approved
  • 39 PLEASANT BLVD
    Official Plan / Zoning By-law Amendment · Council Approved
  • 45 ST CLAIR AVE W
    Site Plan · Under Review

For sale here now

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.