Lot check

8 Colborne St, Toronto

Zoning CR

Commercial Residential with a site-specific exception.

Height limit: 76 m

An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013

Homes allowed

Apartment or mixed-use zone: more homes possible.

Ward 13, Toronto Centre. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits None mapped

  • Heritage: not on the register
  • Flood and conservation: none mapped

Rulings within 400 m

All rulings

Building permits here

  • Balcony/Guard Repairs · 2018 · Inspection
    Proposed intallation of new guards on rooftime surrounding mechanical area for an existing apratment building.
  • Interior Alterations · 2017 · Cancelled
    Proposal for interior alteration below grade installing new demising wall creating new storage rooms with heating ventilation and sprinklers
  • Interior Alterations · 2015 · Inspection
    Proposal for interior alterations to residential suites on the 25th floor . Scope of work includes removing a partition wall to combine suit

Development applications within 500 m

  • 69 YONGE ST
    Site Plan · Application Received
  • 63 ADELAIDE ST E
    Official Plan / Zoning By-law Amendment · Under Review
  • 1 FRONT ST W
    Official Plan / Zoning By-law Amendment · Council Approved
  • 60 YONGE ST
    Site Plan · Under Review
  • 114 CHURCH ST
    Plan of Condominium · Draft Plan Approved
  • 55 YONGE ST
    Official Plan / Zoning By-law Amendment · Under Review

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.