67 Heath St W, Toronto
Zoning R
Residential with a site-specific exception.
Height limit: 12 m
An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013
Homes allowed
- ✅ Up to 6 homes in a house-form building (sixplex ward)
- ✅ Plus a garden suite, or a laneway suite if the lot is on a public lane
Ward 12, Toronto-St. Paul's. Development charges are waived for multiplexes of up to 6 homes in Toronto.
Limits None mapped
- Heritage: not on the register
- Flood and conservation: none mapped
Applications at this address
-
Approved · Jun 7, 2017
-
Pending
Rulings within 400 m
No Committee of Adjustment rulings on 3+ unit projects nearby since 2017.
Building permits here
- Pool Fence Enclosure · 2018 · ClosedProposed pool fence enclosure.
- New Building · 2015 · ClosedPART A - Lead File - Proposal to construct a total of three 3 townhomes with finished basements. SFD. See 3 ZZC's, COA, OMB, BLD permits for
- Demolition · 2015 · ClosedProposal to demolish existing 3 storey SFD. Also see demo of 71 Heath St W and 3 new dwellings.
Development applications within 500 m
- 1560 YONGE STSite Plan · Application Received
- 1 HEATH ST ESite Plan · Under Review
- 200 LONSDALE RDSite Plan · Under Review
- 135 ST CLAIR AVE WSite Plan · Under Review
- 15 DELISLE AVEPlan of Condominium · Draft Plan Approved
- 59 LAWTON BLVDSite Plan · Under Review
For sale here now
- 67 Heath Street W$3,798,888
Run the numbers for this lot See it on the planning map
A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.
Talk to us about a property
Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.