Lot check

48 Sharron Dr, Toronto

Zoning RD

Residential Detached.

Height limit: 8.5 m

Lot coverage: 35%

Zoning By-law 569-2013

Homes allowed

  • ✅ Up to 4 homes in a house-form building
  • ✅ Plus a garden suite, or a laneway suite if the lot is on a public lane
  • — Sixplexes aren’t allowed as of right in ward 15 yet (only in 9 wards); a variance would be needed

Ward 15, Don Valley West. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits None mapped

  • Heritage: not on the register
  • Flood and conservation: none mapped

Applications at this address

Rulings within 400 m

No Committee of Adjustment rulings on 3+ unit projects nearby since 2017.

All rulings

Building permits here

  • Interior Alterations · 2022 · Cancelled
    Install two new windows ground floor dining area
  • Demolition · 2019 · Closed
  • New Building · 2019 · Closed
    Construct a new two storey SFD-Detached (246.64m2) with attached garage
  • Multiple Projects · 2018 · Cancelled
    Proposal for multiple projects to an existing 2 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, a 1 storey si

Development applications within 500 m

  • 134 LAIRD DR
    Plan of Condominium · Under Review
  • 132 LAIRD DR
    Plan of Condominium · Under Review
  • 134 LAIRD DR
    Site Plan · Appeal Received
  • 132 LAIRD DR
    Site Plan · Appeal Received
  • 220 MCRAE DR
    Plan of Condominium · Closed

For sale here now

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.