Lot check

44 Massey St, Toronto

Zoning R

Residential with a site-specific exception.

Height limit: 13 m

An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013

Homes allowed

  • ✅ Up to 6 homes in a house-form building (sixplex ward)
  • ✅ Plus a garden suite, or a laneway suite if the lot is on a public lane

Ward 10, Spadina-Fort York. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits None mapped

  • Heritage: not on the register
  • Flood and conservation: none mapped

Applications at this address

Rulings within 400 m

All rulings

Building permits here

  • Second Suite · 2023 · Closed
    TO LEGALIZING A SECONDARY SUITE IN THE EXISTING HOUSE
  • Multiple Projects · 2018 · Closed
    Rev03: Proposed vestibule at front extranceRevision #02 - Proposed 1st, 2nd, and 3rd floor wall alterations detailed on page 2.2, 2.3, and 2
  • Green Roof · 2018 · Closed
    Proposal for a green roof on existing single family dwelling
  • Underpinning · 2016 · Closed
    Proposal to underpin the basement of the existing townhouse - single family dwelling.

Development applications within 500 m

  • 952 KING ST W
    Site Plan · Under Review
  • 952 KING ST W
    Official Plan / Zoning By-law Amendment · Council Approved
  • 127 STRACHAN AVE
    Site Plan · Under Review
  • 97 STRACHAN AVE
    Site Plan · NOAC Issued
  • 230 NIAGARA ST
    Site Plan · Appeal Received
  • 835 QUEEN ST W
    Site Plan · NOAC Issued

For sale here now

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.