Lot check

3390 Weston Rd, Toronto

Zoning RA

Residential Apartment with a site-specific exception.

Lot coverage: 35%

An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013

Homes allowed

Apartment or mixed-use zone: more homes possible.

Ward 7, Humber River-Black Creek. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits None mapped

  • Heritage: not on the register
  • Flood and conservation: none mapped

Rulings within 400 m

No Committee of Adjustment rulings on 3+ unit projects nearby since 2017.

All rulings

Building permits here

  • Garage Repair/Reconstruction · 2026 · Permit Issued
    Garage stairwell repairs - localized concrete repairs within stairwells; installation of elastomeric pedestrian coating at top exterior land
  • Sprinklers · 2025 · Permit Issued
    Proposal to replace the dry sprinkler system on Level P1 and P2.
  • Balcony/Guard Repairs · 2024 · Inspection
    Targeted concrete repairs to the second floor south terrace slab
  • Standpipes · 2022 · Inspection
    REPLACE EXISTING SPRINKLER, STANDPIPE AT P-1, P-2 PARKING GARAGE AND REPLACEEXISTING STANDPIPE FIRE PUMP
  • Garage Repair/Reconstruction · 2022 · Inspection
    Proposal for complete repairs to localized portions of the garage roof deck structure.
  • Garage Repair/Reconstruction · 2019 · Closed
    Revision #1: Exit signs and the emergency lighting/battery pack and a door to remain. Proposal for parking vestibule upgrades.

Development applications within 500 m

  • 3400 WESTON RD
    Site Plan · Under Review
  • 3406-3434 WESTON RD
    Official Plan / Zoning By-law Amendment · Council Approved
  • 3350 WESTON RD
    Site Plan · Under Review
  • 3415-3499 WESTON RD
    Official Plan / Zoning By-law Amendment · Council Approved
  • 3350 WESTON RD
    Official Plan / Zoning By-law Amendment · Closed

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.