Lot check

284 King St E, Toronto

Zoning CR

Commercial Residential with a site-specific exception.

Height limit: 16 m

An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013

Homes allowed

Apartment or mixed-use zone: more homes possible.

Ward 13, Toronto Centre. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits Check

  • Heritage: Heritage Conservation District (Part V)
  • Flood and conservation: none mapped

Rulings within 400 m

All rulings

Building permits here

  • Electromagnetic Locks · 2025 · Closed
    Proposal to install one magnetic lock at ground floor main lobby door,.
  • New Building · 2024 · Inspection
    32 Storey residential development with 216 units and 1 retail unit at grade. There are also 4 levels underground parking and a mechanical pe
  • Partial Permit - Structural Framing · 2024 · Closed
    Conditional Permit - Part Permit - 32 Storey residential development with 219 units and 1 retail unit at grade. There are also 4 levels unde
  • Alternative Solution · 2023 · Approved
    Proposal for Alternative Solution regarding standpipe system IN SCISSOR EXIT STAIR
  • Partial Permit - Foundation · 2023 · Cancelled
    Conditional Permit - Part Permit - 32 Storey residential development with 219 units and 1 retail unit at grade. There are also 4 levels unde
  • Shoring · 2022 · Closed
    Proposal for shoring and excavation for the purpose of sdandalone site/soil remediation.

Development applications within 500 m

  • 231 RICHMOND ST E
    Plan of Condominium · Draft Plan Approved
  • 31 PARLIAMENT ST
    Plan of Condominium · Draft Plan Approved
  • 281 FRONT ST E
    Official Plan / Zoning By-law Amendment · Under Review
  • 4 GILEAD PL
    Site Plan · Application Received
  • 4 GILEAD PL
    Official Plan / Zoning By-law Amendment · OMB Appeal
  • 298 KING ST E
    Site Plan · OMB Appeal

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.