Lot check

2600 Bathurst St, Toronto

Zoning RA

Residential Apartment with a site-specific exception.

Lot coverage: 35%

An exception can change what’s allowed here; read it in the by-law before relying on this. Zoning By-law 569-2013

Homes allowed

Apartment or mixed-use zone: more homes possible.

Ward 8, Eglinton-Lawrence. Development charges are waived for multiplexes of up to 6 homes in Toronto.

Limits None mapped

  • Heritage: not on the register
  • Flood and conservation: none mapped

Rulings within 400 m

No Committee of Adjustment rulings on 3+ unit projects nearby since 2017.

All rulings

Building permits here

  • Sprinklers · 2026 · Not Started
    REV: Proposal for addition of smoke detectors in the lobby area. No changes are proposed to the building structural elements or occupancy cl
  • Interior Alterations · 2026 · Permit Issued
    Proposed interior alterations to Unit PH
  • Interior Alterations · 2026 · Permit Issued
    Proposed minor interior alterations for the first & basement-floor.
  • Interior Alterations · 2025 · Permit Issued
    Proposal to construct a new emergency power generator room and lockers on Level P2 of an existing apartment building.See also 25 104572 WNP
  • Garage Repair/Reconstruction · 2024 · Inspection
    Proposal for Parking Garage Rehabilitation
  • Interior Alterations · 2018 · Closed
    Demolition of interior partion. Revised partion layout. Alteration to plumbing and hvac system. New finishes through out apartment. on the 9

Development applications within 500 m

  • 282 STRATHALLAN WOOD
    Official Plan / Zoning By-law Amendment · Under Review
  • 2793 BATHURST ST
    Site Plan · NOAC Issued
  • 525 CHAPLIN CRES
    Site Plan · Under Review
  • 2788 BATHURST ST
    Site Plan · Closed
  • 2788 BATHURST ST
    Plan of Condominium · Closed
  • 2525 BATHURST ST
    Site Plan · Closed

For sale here now

A reading of the City’s public zoning maps, not a zoning opinion or legal advice. Site-specific exceptions, lot size, trees, heritage and servicing decide what a lot can really take: confirm with a zoning review or a planner before you buy. Sources: City of Toronto open data (zoning, wards, heritage register, building permits, Committee of Adjustment), conservation authorities’ open data.

Talk to us about a property

Buying an income property, adding units or building a multiplex? Tell Mehran Salehian about the property and what you have in mind. You’ll get a reply with next steps, and a full feasibility review if the project is worth one.